MC 22 & CPH Verona Italy
Watch the Comacchio MC 22 at work in Verona on the motorway A4 – cosntruction of a new overpass for the High Speed / High Capacità railway Milan – Verona. Installation
Switzerland CERN
One of the crucial aspects of the HL-LHC project is the upgrade of the cryogenic test station used for the test of the LHC prototype magnets, known as SM18 (building 2173). Today,
Austria Geothermal Building Well
The new MC 14 used in Austrian for a geotechnical engineering project. This compact and powerful drilling rig in the 16-ton weight class, one of the mainstays of the Comacchio MC s